master's thesis
CONNECTING DURATION AND ACTIVITY COSTS IN CONSTRUCTION PROJECT

Ksenija Tijanić (2015)
Josip Juraj Strossmayer University of Osijek
Faculty of Civil Engineering
Department for Organization, Technology and Management
Chair of Construction Management and Technology
Metadata
TitlePOVEZIVANJE TRAJANJA I TROŠKOVA U GRAĐEVINSKOM PROJEKTU
AuthorKsenija Tijanić
Mentor(s)Zlata Dolaček-Alduk (thesis advisor)
Abstract
U radu su teorijski obrađeni troškovi u građevinskim projektima, S-krivulja koja povezuje troškove i trajanje u projektu, te je detaljno opisana stara toplana grada Osijeka (Munjara) koja se planira prenamjeniti u tehnički muzej. U praktičnom dijelu se pristupilo planiranju projekta prenamjene te je prikazana strukturna raščlamba projekta (WBS), dinamički plan (gantogram), troškovnik radova s analizom cijena, histogram troškova, Pareto dijagram, te na kraju i način povezivanja troškova i vremena u projektu (S-krivulja).
Keywordsactivity costs activity duration plan bill of quantites S-curve
Parallel title (English)CONNECTING DURATION AND ACTIVITY COSTS IN CONSTRUCTION PROJECT
Committee MembersPetar Brana (committee chairperson)
Zlata Dolaček-Alduk (committee member)
Hrvoje Krstić (committee member)
GranterJosip Juraj Strossmayer University of Osijek
Faculty of Civil Engineering
Lower level organizational unitsDepartment for Organization, Technology and Management
Chair of Construction Management and Technology
PlaceOsijek
StateCroatia
Scientific field, discipline, subdisciplineTECHNICAL SCIENCES
Civil Engineering
Construction Organization and Technology
Study programme typeuniversity
Study levelgraduate
Study programmeUniversity graduate study in civil engineering; specializations in: Hydraulic engineering, Supporting structures, Construction management and technology, Transportation engineering
Study specializationConstruction management and technology
Academic title abbreviationmag.ing.aedif.
Genremaster's thesis
Language Croatian
Defense date2015-09-24
Parallel abstract (English)
In this work are theoretically covered expenses from civil engineering projects, Scurve that connects expenses with duration in a project and it is described, in detail, an old heating plant of Osijek (Munjara) which is planned to be converted into tech museum. In practical segment it has been approached towards planning a project convertion and it is shown structural breakdown of the project (WBS), dynamic plan (gantogram), bill of quantites with unit cost estimate, histogram of expenses, Pareto diagram and in the end the way of connecting durations and activity costs inside project (S-curve).
Parallel keywords (Croatian)troškovi trajanje dinamički plan troškovnik S-krivulja
Resource typetext
Access conditionOpen access