master's thesis
PROJECT MANAGEMENT DURING ROAD CONSTRUCTION

Andrea Fišer (2015)
Josip Juraj Strossmayer University of Osijek
Faculty of Civil Engineering
Department for Organization, Technology and Management
Chair of Construction Management and Technology
Metadata
TitleUPRAVLJANJE PROJEKTOM IZGRADNJE PROMETNICE
AuthorAndrea Fišer
Mentor(s)Zlata Dolaček-Alduk (thesis advisor)
Abstract
Ovaj rad prikazuje definicije i dijelove projekta te postupak upravljanja projektom. Izrađena je strukturna raščlamba projekta WBS i organizacijska struktura OBS te su obje međusobno povezane logičkim slijedom. U radu je izrađen i dinamički plan izgradnje (gantogram skupa sa prikazom liste aktivnosti radova) na primjeru izgradnje Zelene ulice u Briješću, skupa sa S-krivuljom koja prati kretanje troškova u vremenu (po danima).
KeywordsProject WBS OBS Dynamic plan S-curve
Parallel title (English)PROJECT MANAGEMENT DURING ROAD CONSTRUCTION
Committee MembersPetar Brana (committee chairperson)
Zlata Dolaček-Alduk (committee member)
Hrvoje Krstić (committee member)
GranterJosip Juraj Strossmayer University of Osijek
Faculty of Civil Engineering
Lower level organizational unitsDepartment for Organization, Technology and Management
Chair of Construction Management and Technology
PlaceOsijek
StateCroatia
Scientific field, discipline, subdisciplineTECHNICAL SCIENCES
Civil Engineering
Construction Organization and Technology
Study programme typeuniversity
Study levelgraduate
Study programmeUniversity graduate study in civil engineering; specializations in: Hydraulic engineering, Supporting structures, Construction management and technology, Transportation engineering
Study specializationConstruction management and technology
Academic title abbreviationmag.ing.aedif.
Genremaster's thesis
Language Croatian
Defense date2015-09-24
Parallel abstract (English)
This work presents the definition and parts of the project also the process of project management. It is describing how the work breakdown structure (WBS), and organizational breakdown structure (OBS) are made and both linked in logical order. The work presents creating a Dynamic plan (Gantt chart together with a list of activities ) on the example of building Zelena ulica in Briješće , along with S-curve that follows the movement of the cost in time ( by day )
Parallel keywords (Croatian)projekt WBS OBS dinamički plan S-krivulja
Resource typetext
Access conditionOpen access
Terms of usehttp://rightsstatements.org/vocab/InC/1.0/
URN:NBNhttps://urn.nsk.hr/urn:nbn:hr:133:600394
CommitterVesna Zobundžija