master's thesis
ANALISYS OF MOST EXPECTED AND PROBABLE TIME OF CONSTRUCTION OF THE PUBLIC BUILDING

Bojan Bulajić (2015)
Josip Juraj Strossmayer University of Osijek
Faculty of Civil Engineering
Department for Organization, Technology and Management
Chair of Construction Management and Technology
Metadata
TitleANALIZA NAJVJEROJATNIJEG I OČEKIVANOG VREMENA IZGRADNJE JAVNE GRAĐEVINE
AuthorBojan Bulajić
Mentor(s)Saša Marenjak (thesis advisor)
Abstract
Cilj diplomskog rada je odrediti vrijeme potrebno za izgradnju javne građevine i odrediti očekivanu vjerojatnost izvršenja projekta prema planu. Tema rada je obrađena na primjeru stambene četverokatnice zgrade smještena na istoku Hrvatske. Kako bi se došlo do potrebnog vremena za izgradnju građevine korištena je Metoda kritičnog puta. Uporabom metode je dobiveno najvjerojatnije vrijeme potrebno za izvođenje projekta. Na osnovu tih podataka je napravljena interpretacija dobivenih rezultata. Na kraju rada je prikazan histogram potrebne radne snage za vjerojatnije vrijeme izvođenja projekta.
KeywordsCPM method PERT method gantt chart project duration expectation manpower histogram
Parallel title (English)ANALISYS OF MOST EXPECTED AND PROBABLE TIME OF CONSTRUCTION OF THE PUBLIC BUILDING
Committee MembersKsenija Čulo (committee chairperson)
Saša Marenjak (committee member)
Hrvoje Krstić (committee member)
GranterJosip Juraj Strossmayer University of Osijek
Faculty of Civil Engineering
Lower level organizational unitsDepartment for Organization, Technology and Management
Chair of Construction Management and Technology
PlaceOsijek
StateCroatia
Scientific field, discipline, subdisciplineTECHNICAL SCIENCES
Basic Technical Sciences
Organization of Labor and Production
Study programme typeuniversity
Study levelgraduate
Study programmeUniversity graduate study in civil engineering; specializations in: Hydraulic engineering, Supporting structures, Construction management and technology, Transportation engineering
Study specializationConstruction management and technology
Academic title abbreviationmag.ing.aedif.
Genremaster's thesis
Language Croatian
Defense date2015-09-28
Parallel abstract (English)
The main purpose of this thesis is to assess the time needed to construct public building and to dermine probability of that projects execution. The theme was done on an example of four story building located in east Croatia. In order to calculate the time, critical path method was used. Using this method, the most likely time for project execution was obtained. Based on that data, interpretation on the results was done. At the end of the thesis, histogram of manpower needed for project execution was shown.
Parallel keywords (Croatian)CPM metoda PERT metoda gantogram vjerojatnost trajanja projekta histogram radne snage
Resource typetext
Access conditionOpen access
Terms of usehttp://rightsstatements.org/vocab/InC/1.0/
URN:NBNhttps://urn.nsk.hr/urn:nbn:hr:133:987147
CommitterVesna Zobundžija