Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations
Buildings, 9 (2019), 1; 21. https://doi.org/10.3390/buildings9010021

Dasović, Borna; Galić, Mario; Klanšek, Uroš

Citations:
,
Cite this document

Dasović, B., Galić, M. & Klanšek, U. (2019). Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations. Buildings, 9. (1). doi: 10.3390/buildings9010021

Dasović, Borna, et al. "Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations." Buildings, vol. 9, no. 1, 2019. https://doi.org/10.3390/buildings9010021

Dasović, Borna, Mario Galić and Uroš Klanšek. "Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations." Buildings 9, no. 1 (2019). https://doi.org/10.3390/buildings9010021

Dasović, B., Galić, M. and Klanšek, U. (2019) 'Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations', Buildings, 9(1). doi: 10.3390/buildings9010021

Dasović B, Galić M, Klanšek U. Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations. Buildings [Internet]. 2019 [cited 2025 April 07];9(1). doi: 10.3390/buildings9010021

B. Dasović, M. Galić and U. Klanšek, "Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations", Buildings, vol. 9, no. 1, 2019. [Online]. Available at: https://urn.nsk.hr/urn:nbn:hr:133:567082. [Accessed: 07 April 2025]

Please login to the repository to save this object to your list.
accessibility

closeAccessibilityrefresh

If you wish to permanently save changes, click on Save, if not - your settings will be reset when you restart the browser.