Znanstveni rad - Izvorni znanstveni rad
Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations
Buildings, 9 (2019), 1; 21. https://doi.org/10.3390/buildings9010021

Dasović, Borna; Galić, Mario; Klanšek, Uroš

Citirajte ovaj rad

Dasović, B., Galić, M. i Klanšek, U. (2019). Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations. Buildings, 9. (1). doi: 10.3390/buildings9010021

Dasović, Borna, et al. "Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations." Buildings, vol. 9, br. 1, 2019. https://doi.org/10.3390/buildings9010021

Dasović, Borna, Mario Galić i Uroš Klanšek. "Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations." Buildings 9, br. 1 (2019). https://doi.org/10.3390/buildings9010021

Dasović, B., Galić, M. i Klanšek, U. (2019) 'Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations', Buildings, 9(1). doi: 10.3390/buildings9010021

Dasović B, Galić M, Klanšek U. Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations. Buildings [Internet]. 2019. [pristupljeno 18.12.2024.];9(1). doi: 10.3390/buildings9010021

B. Dasović, M. Galić i U. Klanšek, "Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations", Buildings, vol. 9, br. 1, 2019. [Online]. Dostupno na: https://urn.nsk.hr/urn:nbn:hr:133:567082. [Citirano: 18.12.2024.]

Prijavite se u repozitorij kako biste mogli spremiti objekt u svoju listu.